The CSV lifecycle is a series of controlled decisions that establish and maintain confidence in a computerized system’s intended regulated use. Each phase produces evidence that informs the next. The release report should explain the link between actual use, requirements, risks, tests and unresolved limitations.
For project-specific support, explore computer system validation consulting.
Plan around intended use and applicability
Identify the regulated process, official records, system boundaries, configuration, interfaces and owners. Determine applicable regulatory obligations before creating the plan. A site may maintain a validation master plan, but a system-specific plan should define the assurance approach, deliverables, acceptance criteria and roles.
Translate process needs into requirements
Define observable functional and regulatory needs for the actual workflow. Include data inputs, calculations, decisions, roles, exceptions and records. Assign stable identifiers and prioritize requirements by risk. Review the supplier specification against the organization’s intended use rather than accepting generic features as the requirements.
Evaluate configuration and supplier evidence
Assess the supplier, platform version, configuration, deployment environment and applicable interfaces. Reuse relevant supplier evidence when its scope and limitations are understood. Determine which locally configured functions require additional review or testing.
Test critical functions and document deviations
Choose test methods based on risk and applicable requirements. IQ, OQ and PQ can organize evidence of installation, operation and performance, but separate documents are not universally prescribed. For relevant controls, include negative and boundary tests, data integrity and end-to-end workflows. Resolve or justify deviations through the quality system.
Approve release and maintain continued control
Reconcile requirements, risks, tests, exceptions, training and operational procedures. Document whether the evidence supports the intended use and any limitations. Assign post-release owners and define change assessment, incident handling, periodic review and retirement arrangements.
Evidence and decision matrix
| Area | Evidence or action | Owner / decision |
|---|---|---|
| Planning | Intended use, applicability, plan and acceptance criteria | Process owner / QA |
| Requirements | Approved, testable requirements and risk priorities | Business SME |
| Configuration | Version, baseline, supplier evidence and interfaces | IT / supplier |
| Testing | Traceable results, exceptions and relevant evidence | Validation lead |
| Release | Summary, deviations, approvals and operational readiness | QA / system owner |
| Continued control | Change history, incidents, periodic review and retirement | System owner |
Practical example
For a configurable eQMS, the supplier may provide platform-level testing while the customer defines site-specific deviation and CAPA workflows. Review the supplied evidence, then test the local routing, permissions and signatures for critical steps. Connect each result to the approved requirement and record the production baseline.
Related reading: DQ, IQ, OQ and PQ in CSV.
Regulatory references and scope
Apply regulatory requirements to their scope. Guidance and practical frameworks are not universal legal requirements.
- 21 CFR Part 11 — Electronic records and electronic signatures
- FDA Part 11: Scope and Application (guidance)
- 21 CFR 211.68 — Automatic, mechanical and electronic equipment
- European Commission EudraLex Volume 4 — Annex 11
- FDA Computer Software Assurance for Production and Quality Management System Software (February 2026)